/* Make accordions closed by default */ /* To make certain favicons are showing */
Phone (206) 323-4144

Housing

Archives and portfolio page of housing civil engineering projects completed by Bush, Roed and Hitchings.


Austin Bell

Austin Bell

Constructed in 1889 as a hotel, the historic landmark structure was reinforced to meet code and converted to residential and retail use. BRH provided grading design, storm drainage, water supply for domestic and fire systems, sewer design and coordination with the City of Seattle.

Courtyard on Main

Courtyard on Main

This is a 231,000 Sq.Ft. 4-story mixed-use project in Bellevue. Besides standard civil design, BRH performed a drainage basin analysis to demonstrate to the city that downstream improvements were not required. This resulted in savings to the client. BRH also assisted the client through Bellevue’s complex permitting process.

The Blakely

The Blakely

This is a 231,000 Sq.Ft., 4-story residential mixed-use project in Bellevue. Besides civil design, BRH performed a drainage basin analysis to demonstrate to the city that downstream improvements were not required. Resulting in savings for the client. BRH also assisted the client through Bellevue’s complex permitting process.

Tressa

Tressa

This project was complicated by the lack of storm drainage and sanitary sewer infrastructure. This required cooperation with the City over land use, and the extension of city-owned lines. The widening of North 143rd was necessary, and the intersecting Linden Avenue...
Woodmark

Woodmark

Woodmark at Steel Lake is an assisted living community located in Federal Way. This facility provides 98 senior living apartments for the residents. BRH prepared the site layout and grading design, plus full construction documents and permit support for all site utilities and parking.

LATCH

LATCH

The Roxbury Village scope involved the construction of 36 new townhouses, surface parking, play space, and a courtyard area. Engineering design included an adjacent wetland area and regrading around the 11 buildings on the site. Our utility design included a pumped storm drainage system.