BRH provided a topographic base map showing all features such as buildings, retaining walls, adjacent roadways, paths, and underground utilities for Paccar and Dempsey Halls. Vaults were also shown, as were fiber-optic and secondary power lines, plus we provided a 3D “as-built” survey of the tunnel system.
This new K-6 school is a 2-story, 66,500 square foot facility serving over 450 students. BRH was contracted to provide a full-site topographic and utility survey for this demolish and reconstruction project. The scope included the provision of spot elevations on a 50-foot grid to generate contours for the design team.
This 1,400 student school received a complete renovation and modernization, including a new performing arts center, gymnasium and classrooms. BRH provided a full boundary and topographic survey of the school grounds. Our mapping included detailed utility data over the entire school property for the engineering team.
This 5 story residence houses 363 students in a full amenity facility. BRH has worked on multiple sites all over the Seattle Pacific University campus. For Emerson Hall, we provided topographic mapping and utility detection and location.
Glacier Peak High and Little Cedars Elementary share a 65-acre, Snohomish School District site. We conducted easement research and provided boundary, topographic and utility surveys on this heavily forested site. The scope included extensive right-of-way surveys along SR9 and Cathcart Way.
This Lake Washington School District grade 6-12 magnet school is sited on 22 acres. BRH provided topographic, utility, and boundary surveys. We also staked the detention pond, test and infiltration pit locations, and provided tree and buffer zone clearances to support vegetation studies. In addition, BRH provided a construction survey.